Three days of very strong winds did not stop the students from working on the roof. All roof joists are in place and gussets are screwed in place.
Rigid insulation (1.5 " yellow) is applied over the 6 mil vapour barrier. Fiberglass insulation, R20 is applied on the cold side of the vapour barrier.